Pages

Friday, May 13, 2011

Cloud seeding In Australia


Australia, CSIRO’s activities in Tasmania in the 1960s were successful. Seeding over the Hydro-Electricity Commission catchment area on the Central Plateau achieved rainfall increases as high as 30% in autumn. The Tasmanian experiments were so successful that the Commission has regularly undertaken seeding ever since in mountainous parts of the State.
In 2004, Snowy Hydro Limited began a trial of cloud seeding to assess the feasibility of increasing snow precipitation in the Snowy Mountains in Australia. The test period, originally scheduled to end in 2009, was later extended to 2014. The New South Wales (NSW) Natural Resources Commission, responsible for supervising the cloud seeding operations, believes that the trial may have difficulty establishing statistically whether cloud seeding operations are increasing snowfall. This project was discussed at a summit in Narrabri, NSW on 1 December 2006. The summit met with the intention of outlining a proposal for a 5 year trial, focussing on Northern NSW.
The various implications of such a widespread trial were discussed, drawing on the combined knowledge of several worldwide experts, including representatives from the Tasmanian Hydro Cloud Seeding Project however does not make reference to former cloud seeding experiments by the then Snowy Mountains Authority which rejected weather modification. The trial required changes to NSW environmental legislation in order to facilitate placement of the cloud seeding apparatus. The modern experiment is not supported for the Australian Alps.
In December 2006, the Queensland government of Australia announced A$7.6 million in funding for "warm cloud" seeding research to be conducted jointly by the Australian Bureau of Meteorology and the United States National Center for Atmospheric Research. Outcomes of the study are hoped to ease continuing drought conditions in the states South East region.

No comments:

Post a Comment